Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 午夜成人在线观看 | 精品少妇人妻嫩草久久熟睡 | 精品日韩国产A∨ | 极品97尤物被啪到呻吟喷水 | 国产人妻人伦精品熟女A玄幻 | 黄色的免费看蜜桃91网站www | 国产一区二区污污在线观看 | 四川少妇xxxx | 国产精品有线一区二区三区 | 午夜福利在线观看一区二区三区国产 | 欧美性猛交XXXX乱大交极品 | 真人无吗avvvvv | 国产一区二区四区在线 | 人妻少妇精品无码专区二区伦伦 | 人妻无码精品一区二区动漫竹菊 | 黄色视频在线观看网站 | 四川少妇搡BBB搡BBB爽爽爽小说 | 国产精品999国产精品视频 | 成人免费毛片 嘿嘿连载视频 | 亚洲精品久久久久久久久久蜜桃 | 欧亚乱熟女一区二区在线 | 黄色免费视频网址入口 | 91人妻人妻欧美 | 人体色情乱一区二区三区 | 亚洲AV无码秘 蜜桃羞羞 | 日韩精品高清无码 | 国产性猛交 91 | 亚洲精品视频在线观看狠狠 | 欧美性猛交XXXX乱大交蜜桃 | 亚洲精品成a人在线观看 | 久久婷婷五夜综合色 | 夜夜嗨AV无码专区一区二区三区 | 91在线无精精品秘 人妻无码 | 黄色视频在线网站 | 国产精品宾馆在线 | 鲁大师在线日本免费 | 啪免费91不卡免费 | 无人码人妻一区二区三区免费 | 午夜伦伦电影理论片A片在线 | 国产互换人妻好紧4p |