Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 亚洲五婷国偷自产高清完整版 | 成人做爰黄A片免费看三区蜜臀 | 黄瓜国产在线一区二区 | 国产偷玩农村老妇女视频 | 91国内揄拍国内精品 | 中文字幕最新国产 | 性猛交乱婬AV免费看网站下载 | 国产AV一区二区三区日韩接吻 | 免费观看欧美精品网站 | 国产猛男猛女超爽 | 亚洲精品天堂在线视频 | 老妇槡BBBB槡BBBB槡 | 蜜桃麻豆熟妇A色在线观看 肉丝超薄少妇一区二区三区 | 91精品国产综合久久久久久久 | 17.cc一起草嫩模| 性一交一乱一交A片久久蜜臀 | 色在线最新少妇com 国产农村妇女乱XXⅩ | 国产拍精品亚洲精品久久品泰国 | 中国真实偷伦视频海角国产 | 国产精品欧美色图 | 交AAA免费视频 | 8x8Ⅹ成人永久免费视频在线观看 | 粉嫩av久久一区二区三区 | 日韩avvwww | e奶美女高潮骚叫久久夜 | 国产真人亲妺妺A片 | 欧美性猛交XXXX乱大交3秋霞 | 午夜精品自拍成人电影 | 国产性猛交╳XXX乱大交 | 国产精品女教师诱奷 | 成人性爱视频在线播放 | 黄色视屏在线观看 | 国产午夜精品久久久吃瓜 | 四川女人毛多水多又紧又爽视频 | 另类老妇奶性BBWBBwBBw | 亚洲精品国偷拍一级 | 西西极品wwwwwwww | 91无码人妻精品一区二区灬 | 丰满少妇一级毛片视频一区 | 囯产精品一品二区三区 |